Thorough design studies, seamless planning, scheduling and logistical coordination were all essential aspects of the meticulously planned time schedule. ![]() While the construction itself was intensive, project challenges began long before the first machines started their engines. The 400-person strong site team worked around the clock at various stages to complete the milling of 175,000 m² of asphalt and subsequent re-laying of 56,200 tons of new asphalt, at a speed of 4,600 tons per day at peak performance, as well as the installation of 82,300 m² of special fiber glass grid for asphalt reinforcement and the renewal of the runway lighting and markings. To realize the program of works within the highly challenging timeframe, Julius Berger pooled its resources, mobilizing equipment, highly skilled specialist and technical teams from across its operations in Nigeria to achieve a record breaking pace of work. The existing 3.6 km runway and main taxiways, were extensively deteriorated with aged asphalt, wide alligator cracking, shear deformation and widespread pothole formation – posing a risk for take-offs and landings. ![]() Please feel free to contact us to discuss the challenges you may be facing and for more details on the Auckland Airport project.On April 17, 2017, Julius Berger Nigeria Plc completed emergency rehabilitation of the existing runway and main taxiways at the Nnamdi Azikiwe International Airport, 2 days ahead of schedule, beating the highly challenging 6-week project deadline. These simulations were used for the safety-case workshops, but also, for the briefing of the flight crews: as operating on a temporary displaced threshold runway visually significantly differs from the expected standard operating conditions, the final results are made available to the stakeholders.Īuckland Airport is one of many airports airsight supports for managing technical aviation projects with multiple stakeholders in a highly complex environment. To manage such complexity and to ensure that all stakeholders quickly understand without any ambiguity the proposed options – notably the complex lighting and markings considerations, airsight models the airport environment and construction site in 3D, to finally produce photo-realistic flight-simulations in different scenarios. Just to name a few: aircraft performance limitations, visibility conditions, aeronautical publication and AIRAC cycle constraints, transitions between phases, adverse weather conditions, work-site height limitations, etc.Īdditionally, due to the temporary nature of the construction work, lighting and markings, navaids (ILS) can often not be made available to their normal extent. In this process, the development of a safety case plays a major role: it facilitates open-communication with stakeholders, structures the discussion around well-known principles, and while minimising risks is the top-priority, enables the consideration of numerous other aspects, such as feasibility and costs, environment and social responsibility, etc.Ī project of this nature and associated safety case is highly complex, due to the very high number of scenarios and sub-elements to consider. Thanks to some early preparation and some specificities of Auckland Airport, such as the availability of “Work-In-Progress” (WIP) infrastructural elements (secondary PAPI and wing-bar lights) as well as procedures, the project could be implemented earlier than initially planned – using low traffic period during the COVID-19 outbreak.Ī Safety Case as a platform for collaborationĪs commonly accepted in the industry, the key to the success of such project is a close collaboration with stakeholders, to iteratively identify and evaluate available options and finally, commonly agree on the best solution. Such a project involves detailed preparation, to ensure that all infrastructural and operational elements have been carefully considered while not infringing safety. To avoid a full closure of the runway, the selected method for this project was to temporarily displace the runway threshold. Replacing runway pavement is a very challenging exercise – notably for single-runway airports.Īs publicly announced in May 2020, Auckland Airport’s sole existing runway will be shortened by 1.1km during the 8 to 10-week construction period, to enable some major slabs replacement in the touch-down zone area.įor this impressive 26 million NZD project, Auckland Airport collaborated with airsight in developing the safety case, along with strong involvement with all stakeholder groups (the local ANSP, airlines, pilot associations and federations).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |